ADGM fit-outs require Abu Dhabi Municipality coordination with ADGM's own building guidelines — a process requiring dual-track submission experience that AV Design International delivers as a single workflow.
Overview
ADGM Commercial Fit-Out & Office Design
Abu Dhabi Global Market (ADGM) on Al Maryah Island is the capital's international financial centre, housing global financial institutions, law firms, and professional services firms. Fit-outs within ADGM require Abu Dhabi Municipality compliance alongside ADGM's own Tenancy Fit-Out Guidelines — a dual-jurisdiction process that AV Design International manages end-to-end.
ADGM's Al Sa'fat sustainability requirements (Pearl rating) add an additional layer to commercial fit-outs, covering glazing ratios, HVAC zoning efficiency, and material embodied carbon. We integrate Al Sa'fat compliance into the design phase — not as a post-hoc audit — ensuring smooth authority sign-off and potential Pearl building certification points.
Our Approach
Methodology tailored to the project type.
ADGM floors typically operate with active tenants above and below. We coordinate all structural and MEP work within the building's noise and vibration limits, using isolated fixing systems for partitions and suspended ceilings to prevent sound transmission through the slab.
Al Sa'fat Pearl rating compliance is built into material selection from day one. Low-VOC finishes, recycled-content ceiling tiles, and regionally sourced stone contribute to sustainability points while meeting ADGM's fit-out guidelines.
Multi-floor HQ fit-outs on Al Maryah Island require phasing to maintain building operations. AV Design International delivers floor-by-floor handovers, allowing clients to begin occupying completed floors while work continues on upper levels — eliminating the need for swing space or temporary accommodation.
Materials & Finishes
Typical palette
- Low-VOC acoustic ceiling tiles and wall panels
- Full-height glazed partitions with acoustically rated framing
- Engineered timber flooring and porcelain tile finishes
- Raised access flooring with cable management
- DALI controllable LED lighting with daylight harvesting
- Recycled-content carpet tiles (contributing to Al Sa'fat points)
- Biophilic elements and living walls
- Brand-integrated signage and wayfinding
What's Included
Scope of work
- Abu Dhabi Municipality and ADGM dual-authority submission
- Al Sa'fat Pearl compliance integration
- Workplace strategy and space planning
- 3D visualisation and material boards
- MEP coordination and authority liaison
- Fire-rated partition design and compliance
- Furniture specification and procurement
- Phased floor-by-floor delivery and handover
- Post-occupancy snagging and aftercare
Timeline
12–18 weeks from concept to handover (floor-by-floor phasing available)
Investment
From AED 1,500 to 3,200 per sqm depending on scope and Al Sa'fat requirements
FAQ
Common questions
What approvals are needed for an ADGM fit-out?
ADGM fit-outs require Abu Dhabi Municipality approval (drawing stamp, MEP, fire & life safety, civil defense) plus ADGM's own Tenancy Fit-Out Guidelines compliance. Buildings targeting sustainability certification also need Al Sa'fat documentation. AV Design International submits all tracks in parallel, typically completing approvals in 4–5 weeks.
What is Al Sa'fat and does my fit-out need it?
Al Sa'fat is Abu Dhabi's green building rating system. For commercial fit-outs within ADGM, compliance is required for buildings over 10,000 sq ft. It covers glazing ratios, HVAC zoning efficiency, material embodied carbon, and waste management plans. We integrate these requirements into the design phase to avoid costly retrofits.
Can you deliver a fit-out floor by floor on Al Maryah Island?
Yes. For multi-floor projects, we use phased delivery — each floor is designed as a self-contained zone with its own MEP isolation. This lets clients occupy completed floors immediately while fit-out continues on upper levels, eliminating swing space costs.
What are the after-hours work policies on Al Maryah Island?
ADGM buildings typically permit after-hours work from 7 PM to 7 AM with prior coordination. We submit work schedules to building management 48 hours in advance, use dust-controlled hoarding, and coordinate material deliveries within loading dock operating hours.